Grid interconnection intelligence

What it takes to connect
at any point on the US grid.

LoadFlow studies the history of each interconnection point. We work out what projects there were charged, which limits bind, which upgrades fixed them, and who withdrew. You get a verdict on the site and the record behind it. All numbers are derived from our intelligence layers.

Queue refreshed weekly — projects tracked — grids — POIs
Interconnection point —
Deepest coverage live
Data-center campus —
◆ Site Selection  ·  Beta: MISO · CAISO · SPP

Not every POI is worth a study.

Screening a site costs real money and weeks of an engineer's time. We score all 23,000 interconnection points on what has already happened at each one, so you can build a short list before paying for studies.

—Interconnection points
→
🔒
Screened against the signed recordproprietary model · server side
→
814Signal-grade sites

Every score opens into the evidence underneath it.

Open the map →
◆ Explore · the queue

Queue projects, tied to what happened next.

We match each queue project to its interconnection point, its study results, its signed agreement, and its outcome. The queue then reads as a record of what happened, not a list of requests.

— projects in the current queue view across all grids, geocoded and matched to their history and connection costs.
—Projects tracked
▲ queue refreshed weekly
—Grids covered
7 ISOs plus utilities
—Contacts on record
▲ names and roles from filings
—Agreement dossiers
▲ read from executed agreements
ProjectCapacityISOStatus
J1421, Moler 230 kV300 MWMISOAgreement signed
AF2-132, Reynolds-Olive 345 kV300 MWPJMActive
J907, Brinkley East to Aubrey 230 kV200 MWMISOAgreement signed
Blue Frost Storage I200 MWNYISOWithdrawn
◆ Large load

Where the data centers land,
and what powers them.

1,134 campuses, matched to the plants, power contracts, and queue positions behind them. Each link is verified against the public record.

Explore the tracker →
—Campuses mapped
—Power deals tracked
41Hard-linked to supply
1,223 GWActive grid capacity
◆ Go deeper

Four ways into the same data.

Coverage is deepest in MISO, CAISO, and SPP. Other grids are still filling in, and we label them clearly.

Grid Maps

Live

Search substations, lines, and hosting capacity across the physical grid.

Open maps →

Grid Intelligence

Beta · MISO + CAISO + SPP

We track each constraint over time: when it binds, when an upgrade cures it, and when the next cluster fills it again.

Open →

Project Dossiers

Live

A diligence file on any project: costs, contacts, full history, and a clear list of what we do not have yet.

See a sample →

Study Tool

Demo

We run power flow screening on a synthetic model of the Texas grid, testing 401,000 outage scenarios. This tool is in early preview.

Try the demo →
◆ Signal

What FERC is doing to the queue.

We track the proceedings that change how projects get built, including Order 2023, colocation, and large load, with their deadlines and a daily filing feed.

T1Loading proceedings…
Loading feed…
◆ LoadFlow Intelligence Layer

The rest requires an account.

Cost broken out by component, named developer contacts, the negotiated terms others got, and the full history behind each point.

✓Cost breakdown by component
✓Verified developer contacts
✓Negotiated terms
✓Full point history
✓Peer outcomes
✓Downloadable dossier
Request accessSee a sample dossier
🔒 6 of 8 sections in coverageIdentity · Process · Costs · Contracts · Risk · Evidence
The signed record of America's grid buildout