Screening-grade interconnection studies. In minutes, not months.
Pick a point of interconnection anywhere on the ERCOT grid. The engine runs full AC power flow, N-1 contingency, short circuit, and cost analysis — and delivers a signed PDF report to your inbox.
Network model
6,717 buses · Texas7k ACTIVSg
Analysis
N-0 / N-1 · Short circuit · P10–P90 cost
Turnaround
~5 minutes · PDF emailed
Access
LoadFlow account
Sign in
Use your LoadFlow account — the same email and password you use across the site.
Don't have an account? Create one →
By signing in you agree to the Privacy Policy.
← Back to LoadFlow