$2.43B
CY23 Total SUF — 78 projects
$520M
CY23 ASDU — 10 LI projects
$2.26B
C24 SDU — 57 projects (in progress)
71%
Largest CRIS gap — Q971 East Setauket
CY23 ASDU — SUF vs SDU Cost Breakdown (Source: ASDU Initial Decision, Dec 2024)
ProjectQueueSUF CostSDU CostTotalPOI
Setauket Energy Storage825$19.8M$39.2M$59.0MPort Jefferson Terryville 69kV
Holbrook Energy Storage957$20.8M$31.4M$52.2MHoltsville Patchogue 69kV
East Setauket Energy Storage971$15.5M$64.1M$79.6MHolbrook N Shore Beach 138kV
Suffolk County Storage II1012$3.1M$38.5M$41.6M
CLIES 70MW1117$36.1M$36.1MSills Road 138kV
KCE NY 291123$3.3M$68.3M$71.6MKings 138kV
Barrett Hempstead Battery1254$15.3M$6.8M$22.1MBarrett 138kV
Holtsville Brookhaven Battery1255$12.5M$51.1M$63.6MHoltsville Brookhaven 138kV
Canal Southampton Battery1256$8.6M$50.4M$59.1MCanal Substation 138kV
Edwards Calverton Battery1257$5.3M$30.4M$35.7MEdwards Avenue 138kV
Total$104.4M$416.2M$520.6M
Deliverability Gap — Requested vs Awarded CRIS (Source: CY23 Facilities Study, Table 5)
ProjectRequested ERISRequested CRISAwarded CRISGapGap Visual
Q825 Setauket Energy Storage65.3 MW65.3 MW26.1 MW60%
Q957 Holbrook Energy Storage76.8 MW76.8 MW33.0 MW57%
Q971 East Setauket Energy Storage125 MW125 MW35.8 MW71%
Q1012 Suffolk County Storage II76.8 MW76.8 MW23.2 MW70%
Q1117 CLIES 70MW70 MW70 MW19.8 MW72%
Q1123 KCE NY 29150 MW150 MW55 MW63%
Q1254 Barrett Hempstead Battery40 MW40 MW0 MW100%
Q1255 Holtsville Brookhaven Battery79.9 MW79.9 MW29.9 MW63%
Q1256 Canal Southampton Battery100 MW100 MW29.8 MW70%
Q1257 Edwards Calverton Battery60 MW60 MW17.7 MW71%
Headroom Payment Chain — Who Owes Whom and Why
CY23 ProjectTypeAmountOwed ToFor
Q825 Setauket Energy StorageElectricalTBD (ASDU)CY17 Q467 Shoreham Solar, Q477 Riverhead Solar, Montauk ES, East Hampton ESTerryville-Flowerfield 69kV SDU line
Q825 Setauket Energy StorageFunctional$1,691,772CY21 Q766 Sunrise Wind + Q987 Sunrise Wind IIHolbrook 138kV BPS substation upgrade
Q957 Holbrook Energy StorageElectrical$4,927,617CY21 Q766 Sunrise Wind, Q987, Q956 Holtsville 138kV ES, Q965 Yaphank ESBayport-Great River 69kV SDU line
Q957 Holbrook Energy StorageFunctional$1,691,772CY21 Q766 Sunrise Wind + Q987 Sunrise Wind IIHolbrook 138kV BPS substation upgrade
Q1012 Suffolk County Storage IIFunctional$1,691,772CY21 Q766 Sunrise Wind + Q987 Sunrise Wind IIHolbrook 138kV BPS substation upgrade
Q1117 CLIES 70MWFunctional$1,691,772CY21 Q766 Sunrise Wind + Q987 Sunrise Wind IIHolbrook 138kV BPS substation upgrade
Q1255 Holtsville Brookhaven BatteryFunctional$1,691,772CY21 Q766 Sunrise Wind + Q987 Sunrise Wind IIHolbrook 138kV BPS substation upgrade
Q1256 Canal Southampton BatteryFunctional$1,691,772CY21 Q766 Sunrise Wind + Q987 Sunrise Wind IIHolbrook 138kV BPS substation upgrade
Q1257 Edwards Calverton BatteryFunctional$1,691,772CY21 Q766 Sunrise Wind + Q987 Sunrise Wind IIHolbrook 138kV BPS substation upgrade
Q680 Juno Power ExpressFunctional$6,798,787CY21 Q959 EI Oceanside 2New Bridge 138kV BPS substation upgrade
Q858 Genesee Road SolarElectrical$4,757,192CY19 Q596 Alle Catt II WindPAR at Hillside Station, East Towanda-Hillside 230kV
Q1080 Mineral Basin SolarElectrical$9,526,854CY19 Q596 Alle Catt II WindPAR at Hillside Station, East Towanda-Hillside 230kV
Methodology Watch — C24 vs CY23 Cost Comparison
CY23 — Old Methodology
$520M ASDU across 10 LI projects
$52M average per project. All Zone K. Pilgrim-West Bus PAR $295M is the primary SDU. SUF $104M + SDU $416M to PSEG-LI. 5 projects completed ASDU-1 in Feb 2025.
C24 — New Attachment HH Methodology
$2.26B SDU across 57 projects
$39.6M average per project. Multi-zone. 24 SDUs identified. Pilgrim-West Bus PAR $334M remains binding LI constraint. Edic-Ames Road rebuild alone $600M+ for upstate projects.
Proposed New Rules — Active Watch
Only 3 of 24 C24 SDUs Survive
Under NYISO proposed new SDU methodology: Watercure-Oakdale terminal upgrades ($1.2M), Fresh Kills 345kV PAR for Zone J ($616.6M), and LI East PAR for Zone K ($334M) are the only surviving SDUs. All Highway and most ROS Byway SDUs drop away. Could substantially reduce costs for Zone C, A, D, E, F projects while Zone J and K costs increase.
Largest Non-LI SUF Costs — CY23
EI Steinway 1 + 2 Dominate
Q1016 EI Steinway 1: $576M total (ConEd $176M Part 2 + $400M Part 1). Q1017 EI Steinway 2: $576M total. Q680 Juno Power Express: $210M. Q1288 CPNY-X: $54M. Total CY23 SUF across all 78 projects: $2.43B.